# Commission Decision of 21 August 2013 on the establishment of the annual priority lists for the development of network codes and guidelines for 2014 (Text with EEA relevance) (2013/442/EU), Article 1

Extent: E+W+S+N.I.

The Commission establishes for the development of harmonised electricity rules this annual priority list for 2014:
capacity allocation and congestion management rules including governance for day-ahead and intraday markets including capacity calculation (Commission adoption phase),
network connection rules:
rules on requirements for generators (Commission adoption phase)
rules on distribution system operator and industrial load connection (Commission adoption phase)
rules on high-voltage direct current transmission system connection (finalise network code and start Commission adoption phase),
system operation rules:
rules on operational security (Commission adoption phase)
rules on operational planning and scheduling (Commission adoption phase)
rules on load-frequency control and reserves (Commission adoption phase)
rules on emergency requirements and procedures (finalise network code and start Commission adoption phase),
balancing rules including network-related reserve power (Commission adoption phase),
rules for longer term (forward) capacity allocation (Commission adoption phase),
rules regarding harmonised transmission tariff structures (scoping by ACER to prepare framework guideline).

---
Source: https://www.legislation.gov.uk/eudn/2013/442/article/1 (the official version)
Page: https://openlegislation.uk/eu-decision-2013-442/article-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.