# Commission Decision of 13 October 2014 on the establishment of the annual priority lists for the development of network codes and guidelines for 2015 (Text with EEA relevance) (2014/713/EU), Article 1

Extent: E+W+S+N.I.

The Commission establishes for the development of harmonised electricity rules this annual priority list for 2015:
network connection rules:
rules on requirements for grid connection applicable to generators (Commission adoption phase),
demand connection (Commission adoption phase),
rules on high-voltage direct current transmission system connection (finalise network code and start Commission adoption phase),
system operation rules:
rules on load-frequency control and reserves (Commission adoption phase),
rules on emergency requirements & procedures (finalise network code and start Commission adoption phase),
rules on operational security (Commission adoption phase),
rules on operational planning and scheduling (Commission adoption phase),
rules on capacity allocation and congestion management for day-ahead and intraday markets, including capacity calculation (Commission adoption phase),
balancing rules including network-related reserve power (finalise network code and start Commission adoption phase),
rules for longer term (forward) capacity allocation (Commission adoption phase),
rules regarding harmonised transmission tariff structures (scoping by ACER to prepare framework guideline).

---
Source: https://www.legislation.gov.uk/eudn/2014/713/article/1 (the official version)