Division BAT 9 In order to prevent or, where that is not practicable, to reduce odour from the installation, BAT is to set up, implement and regularly review an odour management plan, as part of the environmental management system (see BAT 1), that includes all of the following elements:
United Kingdom
- I..
a protocol containing actions and timelines;
- II..
a protocol for conducting odour monitoring;
- III..
a protocol for response to identified odour events;
- IV..
an odour prevention and reduction programme designed to identify the source(s); to measure/estimate odour exposure; to characterise the contributions of the sources; and to implement prevention and/or reduction measures.