Division 4.2 Safe and environmentally sound management of hazardous materials
United Kingdom
The ship recycling facility is authorised to accept a ship for recycling that contains hazardous materials as specified in the following table subject to the conditions noted below:
For the management of each item, the national and/or international requirements should be identified for reference. Any limitations imposed under the authorisation granted by the competent authority/-ies of the country where the facility is located should be mentioned. The hazardous materials may be present in parts of the ship or equipment (e.g. in paint or as plastic additives) or in chemical mixtures (e.g. cooling fluids). | |
As per Article 15(2)(f)(ii) of the Regulation, please 1) indicate which management process will be applied, 2) indicate the location where the activity takes place (either within the facility or at a downstream waste management facility — in the latter case, information should also be provided, including the facility name and contact information) and 3) provide evidence that the applied process will be carried out without endangering human health and in an environmentally sound manner. | |
| Management of hazardous materialsf1 | Descriptions of the management stepsf2 |
|---|---|
1) Asbestos | Removal Storage Waste treatment |
| Management of hazardous materials | Descriptions of the management steps |
2) Ozone-depleting substances | Removal Storage Waste treatment |
Heavy metals:
| Removal Storage Waste treatment |
Flame retardants:
| Removal Storage Waste treatment |
11) Radioactive substances | Removal Storage Waste treatment |
| Management of hazardous materials | Descriptions of the management steps |
Other Persistent Organic Pollutants (POPs)
| Removal Storage Waste treatment |
16) Hazardous liquids, residues and sediments | Removal Storage Waste treatment |
17) Paints and coatings that are highly flammable and/or lead to toxic release | Removal Storage Waste treatment |
18) Other Hazardous Materials not listed above and that are not part of the ship structure (specify) | Removal Storage Waste treatment |
Annotations
Footnotes
- f1
For the management of each item, the national and/or international requirements should be identified for reference. Any limitations imposed under the authorisation granted by the competent authority/-ies of the country where the facility is located should be mentioned. The hazardous materials may be present in parts of the ship or equipment (e.g. in paint or as plastic additives) or in chemical mixtures (e.g. cooling fluids).
- f2
As per Article 15(2)(f)(ii) of the Regulation, please 1) indicate which management process will be applied, 2) indicate the location where the activity takes place (either within the facility or at a downstream waste management facility — in the latter case, information should also be provided, including the facility name and contact information) and 3) provide evidence that the applied process will be carried out without endangering human health and in an environmentally sound manner.
Notes on the whole EU Decision
Textual amendments
- F1
Words in Title substituted (31.12.2020) by The Ship Recycling (Facilities and Requirements for Hazardous Materials on Ships) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/277), regs. 1, 7(2); 2020 c. 1, Sch. 5 para. 1(1)