For the purposes of these BAT conclusions, the following definitions apply:

Term usedDefinition
New plantA plant first permitted at the site of the installation following the publication of these BAT conclusions or a complete replacement of a plant on the existing foundations of the installation following the publication of these BAT conclusions
Existing plantA plant that is not a new plant
Major upgradeA major change in the design or technology of a plant and with major adjustments or replacements of the process units and associated equipment
Primary emissionsEmissions directly vented from the furnaces that are not spread to the areas surrounding the furnaces
Secondary emissionsEmissions escaping from the furnace lining or during operations such as charging or tapping and which are captured with a hood or enclosure (such as doghouse)
Primary productionProduction of metals using ores and concentrates
Secondary productionProduction of metals using residues and/or scraps, including remelting and alloying processes
Continuous measurementMeasurement using an ‘automated measuring system’ permanently installed on site for the continuous monitoring of emissions
Periodic measurementDetermination of a measurand (a particular quantity subject to measurement) at specified time intervals using manual or automated methods