OpenLegislation

Division Formula 2

United Kingdom

Original text. Later amendments are not shown.

smPp–=∑i=1nmPPi−mPP–2nn−1

Where:

smPp–
  • Standard deviation of the arithmetic mean of the peak power output [W]

  • mPPi
  • Measurement value of the peak power output [W]

  • mPP–
  • Arithmetic mean of the peak power output [W]

  • n
  • Number of measurements of the peak power output, which is at least 5

  • The standard deviation of arithmetic mean of the PV roof peak power output leads to a statistical margin in the CO2 savings sCCO2. This value is to be calculated in accordance with Formula 3.