Division Phase 2:
United Kingdom
Two evaporation lagoons will be designed and built for receiving of the material collected from Phase 1 and the previously neutralised contents of Tank 24 for natural evaporation of water and land burial of non-hazardous salts. The tanks used for neutralisation of the content of the 24 contaminated tanks will be transported to a smelter for destruction.