Division — Technical coherence and quality
United Kingdom
The clarity, coherence and feasibility of the proposal will be evaluated in view of the project objectives and its expected results. The nature and the scope of the future IP will be taken into account.
Notes on Division 5
Footnotes
- f1
-
The meaning of the term ‘selection’ in Article 24(2)(d) of the LIFE Regulation includes the meaning of the term ‘eligibility’ in Article 19 LIFE Regulation and Article 131 of the Financial Regulation.
Notes on Division 5.1
Footnotes
Notes on Division (b)
Footnotes
- f1
-
A project proposal has to reach at least the minimum pass score for each award criterion and also the sum of scores for criteria for which a minimum score has been fixed has to be equivalent to 55 points or more.