OpenLegislation

Division 1.2 Monitoring

United Kingdom

Original text. Later amendments are not shown.

BAT 2.BAT is to determine either the gross electrical efficiency, the gross energy efficiency, or the boiler efficiency of the incineration plant as a whole or of all the relevant parts of the incineration plant.

Description

In the case of a new incineration plant or after each modification of an existing incineration plant that could significantly affect the energy efficiency, the gross electrical efficiency, the gross energy efficiency, or the boiler efficiency is determined by carrying out a performance test at full load.

In the case of an existing incineration plant that has not carried out a performance test, or where a performance test at full load cannot be carried out for technical reasons, the gross electrical efficiency, the gross energy efficiency, or the boiler efficiency can be determined taking into account the design values at performance test conditions.

For the performance test, no EN standard is available for the determination of the boiler efficiency of incineration plants. For grate-fired incineration plants, the FDBR guideline RL 7 may be used.

BAT 3. BAT is to monitor key process parameters relevant for emissions to air and water including those given below.

Stream/LocationParameter(s)Monitoring
Flue-gas from the incineration of wasteFlow, oxygen content, temperature, pressure, water vapour contentContinuous measurement
Combustion chamberTemperature
Waste water from wet FGCFlow, pH, temperature
Waste water from bottom ash treatment plantsFlow, pH, conductivity

BAT 4. BAT is to monitor channelled emissions to air with at least the frequency given below and in accordance with EN standards. If EN standards are not available, BAT is to use ISO, national or other international standards that ensure the provision of data of an equivalent scientific quality.

Generic EN standards for continuous measurements are EN 15267-1, EN 15267-2, EN 15267-3 and EN 14181. EN standards for periodic measurements are given in the table or in the footnotes.

For periodic monitoring, the monitoring frequency does not apply where plant operation would be for the sole purpose of performing an emission measurement.

If continuous monitoring of N2O is applied, the generic EN standards for continuous measurements apply.

The continuous measurement of HF may be replaced by periodic measurements with a minimum frequency of once every six months if the HCl emission levels are proven to be sufficiently stable. No EN standard is available for the periodic measurement of HF.

For plants incinerating wastes with a proven low and stable mercury content (e.g. mono-streams of waste of a controlled composition), the continuous monitoring of emissions may be replaced by long-term sampling (no EN standard is available for long-term sampling of Hg) or periodic measurements with a minimum frequency of once every six months. In the latter case the relevant standard is EN 13211.

The monitoring only applies to the incineration of waste containing brominated flame retardants or to plants using BAT 31(d) with continuous injection of bromine.

The monitoring does not apply if the emission levels are proven to be sufficiently stable.

The monitoring does not apply where the emissions of dioxin-like PCBs are proven to be less than 0,01 ng WHO-TEQ/Nm3.

Substance/ParameterProcessStandard(s)f1 Minimum monitoring frequencyf2 Monitoring associated with
NOX Incineration of wasteGeneric EN standardsContinuousBAT 29
NH3 Incineration of waste when SNCR and/or SCR is usedGeneric EN standardsContinuousBAT 29
N2O
  • Incineration of waste in fluidised bed furnace

  • Incineration of waste when SNCR is operated with urea

EN 21258f3 Once every yearBAT 29
COIncineration of wasteGeneric EN standardsContinuousBAT 29
SO2 Incineration of wasteGeneric EN standardsContinuousBAT 27
HClIncineration of wasteGeneric EN standardsContinuousBAT 27
HFIncineration of wasteGeneric EN standardsContinuousf4 BAT 27
DustBottom ash treatmentEN 13284-1Once every yearBAT 26
Incineration of wasteGeneric EN standards and EN 13284-2ContinuousBAT 25
Metals and metalloids except mercury (As, Cd, Co, Cr, Cu, Mn, Ni, Pb, Sb, Tl, V)Incineration of wasteEN 14385Once every six monthsBAT 25
HgIncineration of wasteGeneric EN standards and EN 14884Continuousf5 BAT 31
TVOCIncineration of wasteGeneric EN standardsContinuousBAT 30
PBDD/FIncineration of wastef6 No EN standard availableOnce every six monthsBAT 30
PCDD/FIncineration of wasteEN 1948-1, EN 1948-2, EN 1948-3Once every six months for short-term samplingBAT 30

No EN standard available for long-term sampling,

EN 1948-2, EN 1948-3

Once every month for long-term samplingf7 BAT 30
Dioxin-like PCBsIncineration of wasteEN 1948-1, EN 1948-2, EN 1948-4Once every six months for short-term samplingf8 BAT 30

No EN standard available for long-term sampling,

EN 1948-2, EN 1948-4

Once every month for long-term sampling BAT 30
Benzo[a]pyreneIncineration of wasteNo EN standard availableOnce every yearBAT 30

BAT 5. BAT is to appropriately monitor channelled emissions to air from the incineration plant during OTNOC.

  1. Description
  2. Description
  3. Applicability

Annotations

Footnotes

f1

Generic EN standards for continuous measurements are EN 15267-1, EN 15267-2, EN 15267-3 and EN 14181. EN standards for periodic measurements are given in the table or in the footnotes.

f2

For periodic monitoring, the monitoring frequency does not apply where plant operation would be for the sole purpose of performing an emission measurement.

f3

If continuous monitoring of N2O is applied, the generic EN standards for continuous measurements apply.

f4

The continuous measurement of HF may be replaced by periodic measurements with a minimum frequency of once every six months if the HCl emission levels are proven to be sufficiently stable. No EN standard is available for the periodic measurement of HF.

f5

For plants incinerating wastes with a proven low and stable mercury content (e.g. mono-streams of waste of a controlled composition), the continuous monitoring of emissions may be replaced by long-term sampling (no EN standard is available for long-term sampling of Hg) or periodic measurements with a minimum frequency of once every six months. In the latter case the relevant standard is EN 13211.

f6

The monitoring only applies to the incineration of waste containing brominated flame retardants or to plants using BAT 31(d) with continuous injection of bromine.

f7

The monitoring does not apply if the emission levels are proven to be sufficiently stable.

f8

The monitoring does not apply where the emissions of dioxin-like PCBs are proven to be less than 0,01 ng WHO-TEQ/Nm3.