# Commission Implementing Decision (EU) 2019/2010 of 12 November 2019 establishing the best available techniques (BAT) conclusions, under Directive 2010/75/EU of the European Parliament and of the Council, for waste incineration (notified under document C(2019) 7987) (Text with EEA relevance), Division: SCOPE

Extent: E+W+S+N.I.

These BAT conclusions concern the following activities specified in Annex I to Directive 2010/75/EU:
5.2. Disposal or recovery of waste in waste incineration plants:
(a) for non-hazardous waste with a capacity exceeding 3 tonnes per hour;
(b) for hazardous waste with a capacity exceeding 10 tonnes per day.
5.2. Disposal or recovery of waste in waste co-incineration plants:
(a) for non-hazardous waste with a capacity exceeding 3 tonnes per hour;
(b) for hazardous waste with a capacity exceeding 10 tonnes per day;
whose main purpose is not the production of material products and where at least one of the following conditions is fulfilled:
only waste, other than waste defined in Article 3(31)(b) of Directive 2010/75/EU, is combusted;
more than 40 % of the resulting heat release comes from hazardous waste;
mixed municipal waste is combusted.
5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving the treatment of slags and/or bottom ashes from the incineration of waste.
5.3. (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving the treatment of slags and/or bottom ashes from the incineration of waste.
5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving the treatment of slags and/or bottom ashes from the incineration of waste.
These BAT conclusions do not address the following:
Pre-treatment of waste prior to incineration. This may be covered by the BAT conclusions for Waste Treatment (WT).
Treatment of incineration fly ashes and other residues resulting from flue-gas cleaning (FGC). This may be covered by the BAT conclusions for Waste Treatment (WT).
Incineration or co-incineration of exclusively gaseous waste, other than that resulting from the thermal treatment of waste.
Treatment of waste in plants covered by Article 42(2) of Directive 2010/75/EU.
Other BAT conclusions and reference documents which could be relevant for the activities covered by these BAT conclusions are the following:
Waste Treatment (WT);
Economics and Cross-Media Effects (ECM);
Emissions from Storage (EFS);
Energy Efficiency (ENE);
Industrial Cooling Systems (ICS);
Monitoring of Emissions to Air and Water from IED Installations (ROM);
Large Combustion Plants (LCP);
Common Waste Water and Waste Gas Treatment/Management Systems in the Chemical Sector (CWW).

---
Source: https://www.legislation.gov.uk/eudn/2019/2010/annex/division/n1 (the official version)
Page: https://openlegislation.uk/eu-decision-2019-2010/annex/division-n1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.