Division Figure 2 Illustration of a block edge mask
United Kingdom
No harmonised in-block power limit is specified. Tables 2 and 3 assume synchronised operation. Unsynchronised or semi-synchronised operation also necessitates the geographical separation of neighbouring networks. Tables 4 and 6 specify out-of-band power limits for base stations and terminal stations respectively to ensure the protection of the Earth Exploration Satellite Service (EESS) (passive) in the 23,6-24,0 GHz frequency band. Table 5 provides an additional technical condition for base stations to facilitate co-existence with satellite systems in the earth-to-space Fixed Satellite Service (FSS) and in the Inter-Satellite Service (ISS).
Table 1
Definition of BEM elements
| BEM element | Definition |
|---|---|
| In-block | Assigned spectrum block for which the BEM is derived. |
| Baseline | Spectrum within the 24,25-27,5 GHz frequency band used for terrestrial wireless broadband electronic communications services, not including the operator's block under consideration and corresponding transitional regions. |
| Transitional region | Spectrum adjacent to an operator's block. |
| Additional baseline | Spectrum within bands adjacent to the 24,25-27,5 GHz frequency band, where specific power limits apply with respect to other services or applications. |
Table 2
Base station transitional region power limit for synchronised operation
| Frequency range | Maximum TRP | Measurement bandwidth |
|---|---|---|
| Up to 50 MHz below or above an operator's block | 12 dBm | 50 MHz |
Table 3
Base station baseline power limit for synchronised operation
| Frequency range | Maximum TRP | Measurement bandwidth |
|---|---|---|
| Baseline | 4 dBm | 50 MHz |
F1Table 4
Base station additional baseline power limit
| Member States shall not allow new deployments of terrestrial systems capable of providing wireless broadband electronic communications services in the frequency range 22-23,6 GHz, in order to ensure the appropriate protection of the Earth Exploration Satellite Service (passive) and the Radio Astronomy Service in the 23,6-24 GHz frequency band in conjunction with the limit applicable after 1 January 2024 . | |||
| This limit applies to base stations brought into use after 1 January 2024 . This limit does not apply to base stations that have been brought into use prior to that date. For those base stations, the limit of – 33 dBW/200 MHz continues to apply after 1 January 2024 . Member States shall consider additional measures to assess and mitigate the aggregate impact of those base stations in relation to their obligation under Article 3(a) regarding the Earth Exploration Satellite Service (passive). Such measures include adaptation of the size of assigned blocks, the antenna configuration, the in-block power or the penetration of equipment. | |||
| Frequency range | Maximum TRP | Measurement bandwidth | Entry into force |
|---|---|---|---|
| 23,6-24,0 GHz | – 33 dBW | 200 MHz | Entry into force of this Decision f1 |
| – 39 dBW | 200 MHz | 1 January 2024 f2 | |
- Explanatory note
- Explanatory note
- Explanatory note
- Table 5Additional condition applying to AAS outdoor base stations
Annotations
Textual amendments
Footnotes
- f1
-
Member States shall not allow new deployments of terrestrial systems capable of providing wireless broadband electronic communications services in the frequency range 22-23,6 GHz, in order to ensure the appropriate protection of the Earth Exploration Satellite Service (passive) and the Radio Astronomy Service in the 23,6-24 GHz frequency band in conjunction with the limit applicable after 1 January 2024 .
- f2
-
This limit applies to base stations brought into use after 1 January 2024 . This limit does not apply to base stations that have been brought into use prior to that date. For those base stations, the limit of – 33 dBW/200 MHz continues to apply after 1 January 2024 . Member States shall consider additional measures to assess and mitigate the aggregate impact of those base stations in relation to their obligation under Article 3(a) regarding the Earth Exploration Satellite Service (passive). Such measures include adaptation of the size of assigned blocks, the antenna configuration, the in-block power or the penetration of equipment.