Division 2.3 Non-routine inspections
United Kingdom
The following shall be taken into consideration:
- (a)
the carrying out of non-routine inspections, including site visits, as soon as possible after the competent authority receives serious complaints concerning non-compliance with the permit requirements or otherwise becomes aware of serious accidents, incidents or occurrences of non-compliance, irrespective of whether such events need to be notified F1..., in particular with a view to:
- (i)
clarifying the causes of the event, its impacts on the environment and human health, and in particular clarifying the circumstances (including the persons) which led to non-compliance;
- (ii)
providing a factual base to facilitate and enable appropriate responses to address the detected non-compliance and prevent future accidents, incidents or occurrences of non-compliance, including, as appropriate, additional inspections, corrective measures by the operator, update of permit conditions, suspension of the permit or use of sanctions;
- (i)
- (b)
the noting by the inspector, where appropriate, of relevant findings of inspections carried out under other applicable F2... legislation;
- (c)
the carrying out of non-routine inspections as soon as possible with respect to, and, where appropriate, before the reconsideration or update of a permit.
Annotations
Textual amendments
- F1
Words in Annex Pt C para. 2.3(a) omitted (31.12.2020) by virtue of The Waste and Environmental Permitting etc. (Legislative Functions and Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1540), regs. 1(2), 17(7)(d)(i)
- F2
Word in Annex Pt C para. 2.3(b) omitted (31.12.2020) by virtue of The Waste and Environmental Permitting etc. (Legislative Functions and Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1540), regs. 1(2), 17(7)(d)(ii)