# Council Directive 92/42/EEC of 21 May 1992 on efficiency requirements for new hot-water boilers fired with liquid or gaseous fuels, Division 4

Extent: E+W+S+N.I.

The notified body must:
4.1. examine the technical documents, verify that the type has been manufactured in conformity with those documents and identify the elements which have been designed in accordance with the relevant provisions of the standards referred to in Article 5 (2) as well as the components which have been designed without applying the relevant provisions of those standards;
4.2. perform or have performed the appropriate examinations and necessary tests to check whether, where the standards referred to in Article 5 (2) have not been applied, the solutions adopted by the manufacturer meet the essential requirements of the Directive;
4.3. perform or have performed the appropriate examinations and necessary tests to check whether, where the manufacturer has chosen to apply the relevant standards, these have actually been applied;
4.4. agree with the applicant the location where the examinations and necessary tests are to be carried out.

---
Source: https://www.legislation.gov.uk/eudr/1992/42/annex/III/division/4 (the official version)
Page: https://openlegislation.uk/eu-directive-1992-42/annex-III/division-4