Division 2.1 Investment costsF1

United Kingdom

Original text. Later amendments are not shown.

  • Investment costs shall include the costs of construction (including financing costs) and the costs of developing the infrastructure plus, where appropriate, a return on the capital investment or profit margin. Costs of land acquisition, planning, design, supervision of construction contracts and project management, and of archaeological and ground investigations, as well as other relevant incidental costs, shall also be included.

  • The recovery of construction costs shall be based on either the design lifetime of the infrastructure or such other amortisation period (not being less than 20 years) as may be considered appropriate for reasons of financing through a concession contract or otherwise. The length of the amortisation period may be a key variable in negotiations regarding the establishment of concession contracts, particularly if the Member State concerned wishes, as part of the contract, to set a ceiling regarding the weighted average toll applicable.

  • Without prejudice to the calculation of investment costs, the recovery of costs may:

    • be apportioned evenly over the amortisation period or weighted to the early, middle or later years, provided that such weighting is carried out in a transparent manner,

    • provide for indexation of tolls over the amortisation period.

  • All historic costs shall be based on the amounts paid. Costs which are still to be incurred will be based on reasonable cost forecasts.

  • Government investment may be assumed to be financed borrowings. The rate of interest to be applied to historical costs shall be the rates that applied to government borrowings over that period.

  • Costs shall be apportioned to heavy goods vehicles (HGVs) on an objective and transparent basis taking account of the proportion of HGV traffic to be carried on the network and the associated costs. The vehicle kilometres travelled by HGVs may for this purpose be adjusted by objectively justified ‘equivalence factors’ such as those set out in point 4 f1 .

  • Provision for estimated return on capital or profit margin shall be reasonable in the light of market conditions and may be varied for the purpose of providing performance incentives for a contracted third party with regard to quality of service requirements. Return on capital may be evaluated using economic indicators such as IRR (internal rate of return on investment) or WACC (weighted average cost of capital).

Annotations

Textual amendments

F1

Inserted by Directive 2006/38/EC of the European Parliament and of the Council of 17 May 2006 amending Directive 1999/62/EC on the charging of heavy goods vehicles for the use of certain infrastructures.

Footnotes

f1

The application of equivalence factors by Member States may take account of road construction developed on a phased basis or using a long life cycle approach.

Notes on Annex III

Textual amendments

F2

Substituted by Directive 2011/76/EU of the European Parliament and of the Council of 27 September 2011 amending Directive 1999/62/EC on the charging of heavy goods vehicles for the use of certain infrastructures (Text with EEA relevance).