OpenLegislation

Division 3.1

United Kingdom

Original text. Later amendments are not shown.

The solid phase of manure and used bedding should be stacked to heat, preferably by adding 100 kg granulated quick lime on 1 m3 manure, ensuring a temperature of at least 70 °C throughout the stack, sprayed with disinfectant and left for at least 42 days, during which the stack should be either covered or re-stacked to ensure thermic treatment of all layers.