Division 3.1
United Kingdom
The solid phase of manure and used bedding should be stacked to heat, preferably by adding 100 kg granulated quick lime on 1 m3 manure, ensuring a temperature of at least 70 °C throughout the stack, sprayed with disinfectant and left for at least 42 days, during which the stack should be either covered or re-stacked to ensure thermic treatment of all layers.