# Directive 2004/50/EC of the European Parliament and of the Council of 29 April 2004 amending Council Directive 96/48/EC on the interoperability of the trans-European high-speed rail system and Directive 2001/16/EC of the European Parliament and of the Council on the interoperability of the trans-European conventional rail system, Annex II

Extent: E+W+S+N.I.

ANNEX II
SUBSYSTEMS
1.
LIST OF SUBSYSTEMS
For the purposes of this Directive, the system constituting the trans-European high-speed rail system may be broken down into the following subsystems:
(a) either structural areas:
infrastructure,
energy,
control and command and signalling,
traffic operation and management,
rolling stock,
(b) or operational areas:
maintenance,
telematics applications for passenger and freight services.
2.
AREAS TO BE COVERED
For each subsystem, the list of aspects relating to interoperability is indicated in the mandates for drawing up TSIs given to the Agency.
Under Article 6(1), these mandates shall be established in accordance with the procedure set out in Article 21(2).
Where necessary, the list of aspects relating to interoperability indicated in the mandates is specified by the Agency in accordance with Article 5(3)(c).

---
Source: https://www.legislation.gov.uk/eudr/2004/50/annex/II (the official version)
Page: https://openlegislation.uk/eu-directive-2004-50/annex-II
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

