Division 1.1.2 The following parameters shall be taken into account:X1
United Kingdom
-
tunnel length,
-
number of tubes,
-
number of lanes,
-
cross-sectional geometry,
-
vertical and horizontal alignment,
-
type of construction,
-
uni-directional or bi-directional traffic,
-
traffic volume per tube (including its time distribution),
-
risk of congestion (daily or seasonal),
-
access time for the emergency services,
-
presence and percentage of heavy goods vehicles,
-
presence, percentage and type of dangerous goods traffic,
-
characteristics of the access roads,
-
lane width,
-
speed considerations,
-
geographical and meteorological environment.