OpenLegislation

Division 2.4 The safety documentation for a tunnel which is at the commissioning stage shall include in addition to the documentation required at the design stage:X1

United Kingdom

Original text. Later amendments are not shown.

  • a description of the organisation, human and material resources and instructions specified by the Tunnel Manager to ensure operation and maintenance of the tunnel,

  • an emergency response plan drawn up jointly with the emergency services which also takes into account people with reduced mobility and disabled people,

  • a description of the system of permanent feedback of experience through which significant incidents and accidents can be recorded and analysed.

Annotations

Editorial notes

X1

Substituted by Corrigendum to Directive 2004/54/EC of the European Parliament and of the Council of 29 April 2004 on minimum safety requirements for tunnels in the trans-European road network (Official Journal of the European Union L 167 of 30 April 2004).