Division 2.4 The safety documentation for a tunnel which is at the commissioning stage shall include in addition to the documentation required at the design stage:X1
United Kingdom
-
a description of the organisation, human and material resources and instructions specified by the Tunnel Manager to ensure operation and maintenance of the tunnel,
-
an emergency response plan drawn up jointly with the emergency services which also takes into account people with reduced mobility and disabled people,
-
a description of the system of permanent feedback of experience through which significant incidents and accidents can be recorded and analysed.