{
  "url": "https://openlegislation.uk/eu-directive-2007-32/annex",
  "json_url": "https://openlegislation.uk/eu-directive-2007-32/annex.json",
  "legislation": "eudr/2007/32",
  "legislation_title": "Commission Directive 2007/32/EC of 1 June 2007 amending Annex VI to Council Directive 96/48/EC on the interoperability of the trans-European high-speed rail system and Annex VI to Directive 2001/16/EC of the European Parliament and of the Council on the interoperability of the trans-European conventional rail system (Text with EEA relevance)",
  "legislation_url": "https://openlegislation.uk/eu-directive-2007-32",
  "path": "annex",
  "kind": "annex",
  "number": null,
  "heading": null,
  "text": "ANNEX VI\nVERIFICATION PROCEDURE FOR SUBSYSTEMS\n1.\nINTRODUCTION\n“EC” verification is the procedure whereby a notified body checks and certifies that a subsystem:\ncomplies with the Directive\ncomplies with the other regulations deriving from the Treaty, and may be put into operation.\n2.\nSTAGES\nThe subsystem is checked at each of the following stages:\noverall design,\nproduction: construction of subsystem, including, for example civil-engineering activities, manufacturing, constituent assembly, overall adjustment,\nfinal testing of the subsystem.\nFor the design phase (including the type tests) and for the production phase the main contractor (or the manufacturer) or its authorised representative established within the Community may apply for an assessment as a first step.\nIn this case, this (these) assessment(s) lead to intermediate statement verification(s) (ISV) issued by the Notified Body chosen by the main contractor (or the manufacturer). This one in turn draws up an “EC declaration of intermediate subsystem conformity” for the relevant phase(s).\n3.\nCERTIFICATE\nThe Notified Body responsible for the “EC” verification draws up the certificate of verification intended for the contracting entity or its authorised representative established within the Community, which in turn draws up the “EC” declaration of verification intended for the supervisory authority in the Member State in which the subsystem is located and/or operates.\nThe Notified Body responsible for “EC” verification assesses the design and production of the subsystem.\nIf available, the Notified Body takes into account the “Intermediate Statements of Verification” (ISV(s)), and, in order to issue the “EC” certificate of verification, it:\nChecks that the subsystem:\nis covered by relevant design and production ISVs delivered to the main contractor (or the manufacturer) if it has asked the Notified Body for these two phases,\nor corresponds as produced to all aspects covered by the design ISV delivered to the main contractor (or the manufacturer) if it has asked the Notified Body only for the design phase,\nVerifies that they cover correctly the requirement of the TSI and assesses the design and production elements that are not covered by the design and/or production ISV(s) delivered to the main contractor (or the manufacturer).\n4.\nTECHNICAL FILE\nThe technical file accompanying the declaration of verification must be made up as follows:\nfor the infrastructure: engineering-structure plans, approval records for excavations and reinforcement, testing and inspection reports on concrete, etc.,\nfor the other subsystems: general and detailed drawings in line with execution, electrical and hydraulic diagrams, control-circuit diagrams, description of data-processing and automatic systems, operating and maintenance manuals, etc.,\nlist of interoperability constituents, as referred to in Article 3, incorporated into the subsystem,\ncopies of the “EC” declarations of conformity or suitability for use with which the above mentioned constituents must be provided in accordance with Article 13 of the Directive accompanied, where appropriate, by the corresponding calculation notes and a copy of the records of the tests and examinations carried out by the notified bodies on the basis of the common technical specifications,\nif available, the intermediate statement(s) of verification (ISV) and, in such a case, the “EC” declaration(s) of intermediate subsystem conformity, that accompany the “EC” certificate of verification, including the result of verification by the Notified Body of their validity,\ncertificate from the Notified Body responsible for “EC” verification, accompanied by corresponding calculation notes and countersigned by itself, stating that the project complies with this Directive and mentioning any reservations recorded during performance of the activities and not withdrawn; the certificate should also be accompanied by the inspection and audit reports drawn up by the same body in connection with its task, as specified in sections 5.3 and 5.4.\n5.\nMONITORING\n5.1.\nThe aim of “EC” monitoring is to ensure that the obligations deriving from the technical file have been met during production of the subsystem.\n5.2.\nThe Notified Body responsible for checking production must have permanent access to building sites, production workshops, storage areas and, where appropriate, prefabrication or testing facilities and, more generally, to all premises which it considers necessary for its task. The contracting entity or its authorised representative within the Community must send it or have sent to it all the documents needed for that purpose and, in particular, the implementation plans and technical documentation concerning the subsystem.\n5.3.\nThe Notified Body responsible for checking implementation must periodically carry out audits in order to confirm compliance with the Directive. It must provide those responsible for implementation with an audit report. It may require to be present at certain stages of the building operations.\n5.4.\nIn addition, the Notified Body may pay unexpected visits to the worksite or to the production workshops. At the time of such visits the Notified Body may conduct complete or partial audits. It must provide those responsible for implementation with an inspection report and, if appropriate, an audit report.\n6.\nSUBMISSION\nThe complete file referred to in paragraph 4 must be lodged with the contracting entity or its authorised agent established within the Community in support of the certificate of verification issued by the Notified Body responsible for verification of the subsystem in working order. The file must be attached to the “EC” declaration of verification which the contracting entity sends to the supervisory authority in the Member State concerned.\nA copy of the file must be kept by the contracting entity throughout the service life of the subsystem. It must be sent to any other Member States which so request.\n7.\nPUBLICATION\nEach Notified Body must periodically publish relevant information concerning:\nrequests for “EC” verification received;\nintermediate statements of verification (ISVs) issued or refused;\ncertificates of verification issued or refused.\n8.\nLANGUAGE\nThe files and correspondence relating to the “EC” verification procedures must be written in an official language of the Member State in which the contracting entity or its authorised representative within the Community is established or in a language accepted by the entity.",
  "extent": "E+W+S+N.I.",
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/eudr/2007/32/annex",
    "retrieved_at": "2026-11-01T15:22:27.418969+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}