# Directive 2009/45/EC of the European Parliament and of the Council of 6 May 2009 on safety rules and standards for passenger ships (Recast) (Text with EEA relevance), Division .3

Extent: E+W+S+N.I.

Testing main compartments by filling them with water is not compulsory. When testing by filling with water is not carried out, a hose test shall be carried out where practicable. This test shall be carried out in the most advanced stage of the fitting out of the ship. Where a hose test is not practicable because of possible damage to machinery, electrical equipment insulation or out fitting items, it may be replaced by a careful visual examination of welded connections, supported where deemed necessary by means such as a dye penetrant test or ultrasonic leak test or an equivalent test. In any case, a thorough inspection of the watertight bulkheads shall be carried out.

---
Source: https://www.legislation.gov.uk/eudr/2009/45/annex/I/chapter/2/part/B/part/2/division/12/division/1/division/.3 (the official version)
Page: https://openlegislation.uk/eu-directive-2009-45/annex-I/chapter-2/part-B/part-2/division-12/division-1/division-.3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

