Division NEW CLASS B, C AND D AND EXISTING CLASS B SHIPS:F1
United Kingdom
- .1Where in a portion or portions of a ship the watertight bulkheads are carried to a higher deck than in the remainder of the ship and it is desired to take advantage of this higher extension of the bulkheads in calculating the floodable length, separate margin lines may be used for each such portion of the ship provided that:
- .2Division .2
- .3Division .3
- .4Division .4
- .5Where a main transverse watertight compartment contains local subdivision and the Administration of the flag State is satisfied that, after any assumed side damage extending over a length of 3,0 metres plus 3 % of the length of the ship or 11,0 metres, or 10 % of the length of the ship whichever is the less, the whole volume of the main compartment will not be flooded, a proportionate allowance may be made in the permissible length otherwise required for such compartment. In such a case the volume of the effective buoyancy assumed on the undamaged side shall not be greater than that assumed on the damaged side.