OpenLegislation

Division .13 F1

United Kingdom

Original text. Later amendments are not shown.

The pump shall have fitted on the delivery side a test valve with a short open-ended discharge pipe. The effective area through the valve and the pipe shall be adequate to permit the release of the required pump output while maintaining the pressure in the system specified in paragraph .9.

Annotations

Textual amendments

F1

Substituted by Commission Directive 2010/36/EU of 1 June 2010 amending Directive 2009/45/EC of the European Parliament and of the Council on safety rules and standards for passenger ships (Text with EEA relevance).