# Directive 2009/45/EC of the European Parliament and of the Council of 6 May 2009 on safety rules and standards for passenger ships (Recast) (Text with EEA relevance), Division .1: Bilge pumping and drainage

Extent: E+W+S+N.I.

In view of the serious loss of stability which could arise due to large quantities of water accumulating on the deck or tank top consequent on the operation of the fixed pressure water-spraying system, the Administration of the flag State may require pumping and drainage facilities to be provided additional to the requirements of Regulation II-1/C/3.
In new class B, C and D ships constructed on or after 1 January 2003 in such case, the drainage system shall be sized to remove not less than 125 % of the combined capacity of both the water spraying system pumps and the required number of fire hose nozzles. The drainage system valves shall be operable from outside the protected space at a position in the vicinity of the extinguishing system controls. Bilge wells shall be of sufficient holding capacity and shall be arranged at the side shell of the ship at a distance from each other of not more than 40 metres in each watertight compartment.

---
Source: https://www.legislation.gov.uk/eudr/2009/45/annex/I/chapter/3/part/B/division/14/division/.3/division/1/division/.1 (the official version)
Page: https://openlegislation.uk/eu-directive-2009-45/annex-I/chapter-3/part-B/division-14/division-.3/division-1/division-.1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

