Division .2a F1F2
United Kingdom
Not later than the first scheduled dry-docking after 1 January 2018 , but not later than 1 July 2019 , lifeboat on-load release mechanisms not complying with paragraphs 4.4.7.6.4 to 4.4.7.6.6 of the LSA Code shall be replaced with equipment that complies with the Code f1 .
Annotations
Textual amendments
- F1
- F2
Footnotes
- f1
-
Refer to the Guidelines for evaluation and replacement of lifeboat release and retrieval systems (MSC.1/Circ.1392).