# Directive 2010/75/EU of the European Parliament and of the Council of 24 November 2010 on industrial emissions (integrated pollution prevention and control) (Recast) (Text with EEA relevance), Division 5.3

Extent: E+W+S+N.I.

(a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC of 21 May 1991 concerning urban waste-water treatment:
(i) biological treatment;
(ii) physico-chemical treatment;
(iii) pre-treatment of waste for incineration or co-incineration;
(iv) treatment of slags and ashes;
(v) treatment in shredders of metal waste, including waste electrical and electronic equipment and end-of-life vehicles and their components.
(b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC:
(i) biological treatment;
(ii) pre-treatment of waste for incineration or co-incineration;
(iii) treatment of slags and ashes;
(iv) treatment in shredders of metal waste, including waste electrical and electronic equipment and end-of-life vehicles and their components.
When the only waste treatment activity carried out is anaerobic digestion, the capacity threshold for this activity shall be 100 tonnes per day.

---
Source: https://www.legislation.gov.uk/eudr/2010/75/annex/I/division/5/division/5.3 (the official version)
Page: https://openlegislation.uk/eu-directive-2010-75/annex-I/division-5/division-5.3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

