# Directive 2010/75/EU of the European Parliament and of the Council of 24 November 2010 on industrial emissions (integrated pollution prevention and control) (Recast) (Text with EEA relevance), Division 3.1

Extent: E+W+S+N.I.

The following measurements shall be carried out at the point of waste water discharge:
(a) continuous measurements of pH, temperature and flow;
(b) spot sample daily measurements of total suspended solids or measurements of a flow proportional representative sample over a period of 24 hours;
(c) at least monthly measurements of a flow proportional representative sample of the discharge over a period of 24 hours of Hg, Cd, TI, As, Pb, Cr, Cu, Ni and Zn;
(d) at least every 6 months measurements of dioxins and furans; however, one measurement at least every 3 months shall be carried out for the first 12 months of operation.

---
Source: https://www.legislation.gov.uk/eudr/2010/75/annex/VI/part/6/division/3/division/3.1 (the official version)
Page: https://openlegislation.uk/eu-directive-2010-75/annex-VI/part-6/division-3/division-3.1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

