Division (5) F1
United Kingdom
The infrastructure manager shall prepare and publish a draft working timetable at the latest four months after the deadline referred to in point (3).
United Kingdom
The infrastructure manager shall prepare and publish a draft working timetable at the latest four months after the deadline referred to in point (3).