OpenLegislation

Division 3 Final inspection

United Kingdom

Original text. Later amendments are not shown.

A notified body chosen by the installer shall carry out the final inspection of the lift about to be placed on the market in order to check the conformity of the lift with the applicable essential health and safety requirements set out in Annex I.

  1. 3.1The installer shall lodge an application for final inspection with a single notified body of his choice and shall provide to the notified body the following documents:
  2. 3.2The examinations shall include at least one of the following:
  3. 3.3The tests of the lift shall include at least the following: