Division 17 F1
United Kingdom
Blocks 4 (See Annex II, Part 1, point 1), 5 (See Annex II, Part 1, point 17) and 6 (See Annex II, Part 1, point 12): Give the number of shipments in block 4 and the intended date of a single shipment or, for multiple shipments, the dates of the first and last shipments, in block 6. In block 5, give the estimated minimum and maximum weight in tonnes (1 tonne equals 1 megagram (Mg) or 1 000 kg) of the waste. In some third countries, giving the volume in cubic metres (1 cubic metre equals 1 000 litres) or other metric units, such as kilograms or litres, may also be acceptable. When other metric units are used, the unit of measure may be indicated and the unit in the document may be crossed out. The total quantity shipped must not exceed the maximum quantity declared in block 5. The intended period of time for shipments in block 6 may not exceed one year, with the exception of multiple shipments to pre-consented recovery facilities according to Article 14 of this Regulation (see paragraph 16), for which the intended period of time may not exceed three years. All shipments must take place within the validity period of the written or tacit consents of all competent authorities concerned issued by the competent authorities according to Article 9(6) of this Regulation. In the case of multiple shipments, some third countries may, based on the Basel Convention, require the expected dates or the expected frequency and the estimated quantity of each shipment to be quoted in blocks 5 and 6 or attached in an annex. Where a competent authority issues a written consent to the shipment and the validity period of that consent in block 20 differs from the period indicated in block 6, the decision of the competent authority overrides the information in block 6.