# Regulation (EC) No 1638/2006 of the European Parliament and of the Council of 24 October 2006 laying down general provisions establishing a European Neighbourhood and Partnership Instrument, Article 10: Management of programmes

Extent: E+W+S+N.I.

1. Joint operational programmes shall, in principle, be implemented through shared management by a joint managing authority located in a Member State. The joint managing authority may be assisted by a joint technical secretariat.
2. The participating countries may propose to the Commission that the joint managing authority should be located in a partner country, provided that the designated body is in a position to apply in full the criteria laid down in the relevant provisions of Regulation (EC, Euratom) No 1605/2002.
3. For the purpose of this Regulation ‘joint managing authority’ shall mean any public or private authority or body, including the state itself, at national, regional or local level, designated jointly by the Member State or States and the partner country or countries covered by a joint operational programme, having the financial and administrative capacity to manage Community assistance and having the legal capacity to conclude the agreements necessary for the purpose of this Regulation.
4. The joint managing authority shall be responsible for managing and implementing the joint operational programme in accordance with the principle of sound technical and financial management, and for ensuring the legality and regularity of its operations. To this end, it shall put in place appropriate management, control and accounting systems and standards.
5. The management and control system of a joint operational programme shall provide for proper separation of the management, certification and audit functions, either through a proper segregation of duties within the managing authority or through the designation of separate bodies for certification and audit.
6. In order to allow the joint operational programmes to prepare adequately for implementation, after the adoption of the joint operational programme and before the signature of the financing agreement, the Commission may allow the joint managing authority to use part of the programme budget to start financing programme activities such as the incurring of operational costs of the managing authority, technical assistance and other preparatory actions. The detailed modalities of such a preparatory phase shall be included in the implementing rules referred to in Article 11.

---
Source: https://www.legislation.gov.uk/eur/2006/1638/article/10 (the official version)
Page: https://openlegislation.uk/eu-regulation-2006-1638/article-10
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

