Division II.1 Monitoring throughfall
United Kingdom
Deposition monitoring shall be site specific. Measurements shall be made in such a way that they are spatially well distributed over the country, if necessary on all Level II plots. Throughfall deposition measurements shall be made on the plot itself. If this is not possible, the measurements shall be made close to the plot and in the same stand. The measurements shall in no way interfere with other measurements of soil and vegetation. Caution shall be taken not to cause any damage to the forest plot.