# Commission Regulation (EC) No 633/2007 of 7 June 2007 laying down requirements for the application of a flight message transfer protocol used for the purpose of notification, coordination and transfer of flights between air traffic control units (Text with EEA relevance), Division 2: The manufacturer shall manage the verification activities and shall in particular:

Extent: E+W+S+N.I.

(a)determine the appropriate test environment;
(b)verify that the test plan describes the constituents in the test environment;
(c)verify that the test plan provides full coverage of applicable requirements;
(d)ensure the consistency and quality of the technical documentation and the test plan;
(e)plan the test organisation, staff, installation and configuration of the test platform;
(f)perform the inspections and tests as specified in the test plan;
(g)write the report presenting the results of inspections and tests.

---
Source: https://www.legislation.gov.uk/eur/2007/633/annex/II/division/2 (the official version)
Page: https://openlegislation.uk/eu-regulation-2007-633/annex-II/division-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

