OpenLegislation

Annex

United Kingdom

Original text. Later amendments are not shown.

Minimum requirements as to the skills and knowledge to be covered by the evaluation bodies

1.

The examination for each of the Categories referred to in Article 4(2) shall comprise the following:

  1. (a)

    a theoretical test with one or more questions testing that skill or knowledge, as indicated in the Category columns by (T);

  2. (b)

    a practical test where the applicant shall perform the corresponding task with the relevant material, tools and equipment, as indicated in the Category columns by (P).

2.

The examination shall cover each of the skill and knowledge groups 1, 2, 3, 4, 5 and 10.

3.

The examination shall cover at least one of the skill and knowledge groups 6, 7, 8 and 9. The candidate shall not know in advance of the examination which of these four components will be examined.

4.

If there is one single box in the categories columns that corresponds to several boxes (several skills and knowledge) in the skills and knowledge column it means that not necessarily all skills and knowledge have to be tested during the examination.

CATEGORIES
SKILLS AND KNOWLEDGE IIIIIIIV
1 Basic thermodynamics
1.01Know the basic ISO standard units as for temperature, pressure, mass, density, energyTT—T
1.02Understand basic theory of refrigeration systems: basic thermodynamics (key terms, parameters and processes such as Superheat, High Side, Heat of Compression, Enthalpy, Refrigeration Effect, Low Side, Sub-cooling), properties and thermodynamic transformations of refrigerants including identification of zeotropic blends and fluid states.TT——
1.03Use relevant tables and diagrams and interpret them in the context of indirect leakage checking (including checking of the good operation of the system): log p/h diagram, saturation tables of a refrigerant, diagram of a single compression refrigeration cycle.TT——
1.04Describe the function of the main components in the system (compressor, evaporator, condenser, thermostatic expansion valves) and the thermodynamic transformations of the refrigerant.TT——
1.05Know the basic operation of the following components used in a refrigeration system and their role and importance for refrigerant leakage prevention and identification: (a) valves (ball valves, diaphragms, globe valves, relief valves), (b) temperature and pressure controls, (c) sight glasses and moisture indicators, (d) defrost controls, (e) system protectors, (f) measuring devices as manifold thermometer, (g) oil control systems, (h) receivers, (i) liquid and oil separators———
2 Environmental impact of refrigerants and corresponding environmental regulations
2.01Have a basic knowledge of climate change and the Kyoto ProtocolTTTT
2.02Have a basic knowledge of the concept of Global Warming Potential (GWP), the use of fluorinated greenhouse gases and other substances as refrigerants, the impact of the emissions of fluorinated greenhouse gases on the climate (order of magnitude of their GWP) and relevant provisions of Regulation (EC) No 842/2006 and relevant Regulations implementing provisions of this Regulation.TTTT
3 Checks before putting in operation, after a long period of non-use, after maintenance or repair intervention, or during operation
3.01Carry out a pressure test to check the strength of the systemPP——
3.02Carry out a pressure test to check the tightness of the system
3.03Use a vacuum pump
3.04Evacuate the system to remove air and moisture according to standard practice
3.05Fill in the data in the equipment records and fill in a report about one or more tests and checks carried out during the examination.TT——
4 Checks for leakage
4.01Know potential leakage points of refrigeration, air-conditioning and heat pump equipmentTT—T
4.02Check equipment records prior to a check for leakage and identify the relevant information on any repeating issues or problem areas to pay special attention toTT—T
4.03Make a visual and manual inspection of the whole system in accordance with the Commission Regulation (EC) No 1516/2007 of 19 December 2007 establishing, pursuant to Regulation (EC) No 842/2006 of the European Parliament and of the Council, standard leakage checking requirements for stationary refrigeration, air conditioning and heat pump equipment containing certain fluorinated greenhouse gasesf1 PP—P
4.04Carry out a check for leakage of the system using an indirect method in accordance with the Commission Regulation (EC) No 1516/2007 and the instruction manual of the systemPP—P
4.05Use portable measuring devices such as manometer sets, thermometers and multi-meters for measuring Volt/Amp/Ohm in the context of indirect methods for leakage checking, and interpret the measured parameters.PP—P
4.06Carry out a check for leakage of the system using one of the direct methods referred to in Commission Regulation (EC) No 1516/2007P———
4.07Carry out a check for leakage of the system using one of the direct methods which does not entail breaking into the refrigeration circuit, referred to in Commission Regulation (EC) No 1516/2007—P—P
4.08Use an electronic leak detection devicePP—P
4.09Fill in the data in the equipment recordsTT—T
5 Environment-friendly handling of the system and refrigerant during installation, maintenance, servicing or recovery
5.01Connect and disconnect gauges and lines with minimal emissionsPP——
5.02Empty and fill a refrigerant cylinder in both liquid and vapour statePPP—
5.03Use a recovery set to recover refrigerant and connect and disconnect recovery set with minimal emissionsPPP—
5.04Drain F-gas contaminated oil out of a systemPPP—
5.05Identify refrigerant state (liquid, vapour) and condition (subcooled, saturated or superheated) prior to charging, to ensure correct method and volume of charge. Fill the system with refrigerant (both in the liquid and vapour phase) without loss of refrigerantPP——
5.06Use scales to weight refrigerantPPP—
5.07Fill in the equipment records with all relevant information concerning the refrigerant recovered or addedTT——
5.08Know requirements and procedures for handling, storage and transportation of contaminated refrigerant and oilsTTT—
6 Component: installation, putting into operation and maintenance of reciprocating, screw and scroll compressors, single and two-stage
6.01Explain the basic functioning of a compressor (including capacity control and lubricating system) and risks of refrigerant leakage or release associated to it.TT——
6.02Install a compressor properly, including control and safety equipment, so that no leak or major release occur once the system is put into operationP———
6.03Adjust the safety and control switchesP———
6.04Adjust the suction and discharge valves
6.05Check the oil return system
6.06Start up and shut down a compressor and check the good working conditions of the compressor, including by making measurements during operation of compressorP———
6.07Write a report about the condition of the compressor which identifies any problems in the functioning of the compressor that could damage the system and eventually lead to refrigerant leakage or release should no action be takenT———
7 Component: installation, putting into operation and maintenance of air cooled and water cooled condensers
7.01Explain the basic functioning of a condenser and risks of leakage associated to itTT——
7.02Adjust a discharge pressure control of the condenserP———
7.03Install a condenser, properly, including control and safety equipment, so that no leak or major release occur when the system has been put into operationP———
7.04Adjust the safety and control switchesP———
7.05Check the discharge and liquid lines
7.06Purge non condensable gases out of the condenser using a refrigeration purging deviceP———
7.07Start up and shut down a condenser and check the good working condition of the condenser including by making measurements during operationP———
7.08Check the surface of the condenserP———
7.09Write a report about the condition of the condenser which identifies any problems in the functioning that could damage the system and eventually lead to refrigerant leakage or release should no action be takenT———
8 Component: installation, putting into operation and maintenance of air cooled and water cooled evaporators
8.01Explain the basic functioning of an evaporator (including defrosting system) and risks of leakage associated to itTT——
8.02Adjust an evaporating pressure control of the evaporatorP———
8.03Install an evaporator including control and safety equipment, so that no leak or major release occur when the system has been put into operationP———
8.04Adjust the safety and control switchesP———
8.05Check the liquid and suction pipelines in the correct position
8.06Check the hot gas defrost pipeline
8.07Adjust evaporation pressure regulation valve
8.08Start up and shut down an evaporator and check the good working condition of the evaporator, including by making measurement during operationP———
8.09Check the surface of the evaporatorP———
8.10Write a report about the condition of the evaporator which identifies any problems in the functioning that could damage the system and eventually lead to refrigerant leakage or release should no action be takenT———
9 Component: installation, putting into operation and servicing of Thermostatic Expansion Valves (TEV) and other components
9.01Explain the basic functioning of different kinds of expansion regulators (thermostatic expansion valves, capillary tubes) and risks of leakage associated to itTT——
9.02Install valves in the correct positionP———
9.03Adjust a mechanical/electronic TEVP———
9.04Adjust mechanical and electronic thermostats
9.05Adjust a pressure regulated valve
9.06Adjust mechanical and electronic pressure limiters
9.07Check the functioning of an oil separatorP———
9.08Check the condition of a filter dryer
9.09Write a report about the condition of these components which identifies any problems in the functioning that could damage the system and eventually lead to refrigerant leakage or release should no action be takenT———
10 Piping: building a leak tight piping system in a refrigeration installation
10.01Weld, braze and/or solder leak free joints on metallic tubes and pipes that can be used in refrigeration, air-conditioning or heat pump systemsPP——
10.02Make/check pipe and component supportsPP——

Annotations

Footnotes

f1

OJ L 335, 20.12.2007, p. 10.