Division 4.2.7.1 Test runF1
United Kingdom
The following procedure applies for each test run:
- (1)
The tow vehicle or the tyre test vehicle is driven onto the test track in a straight line at the specified test speed 65 ± 2 km/h.
- (2)
The recording system is launched.
- (3)
Water is delivered to the pavement ahead of the test tyre approximately 0,5 s prior to brake application (for internal watering system).
- (4)
The trailer brakes are activated within 2 metres of a measurement point of the wetted frictional properties of the surface and sand depth in accordance with points 4 and 5 of section 3.1. The rate of braking application shall be such that the time interval between initial application of force and peak longitudinal force is in the range 0,2 s to 0,5 s.
- (5)
The recording system is stopped.