Division 2.5 Explicit risk estimation and evaluationF1

United Kingdom Repealed

Original text. Later amendments are not shown.

  1. 2.5.1Division 2.5.1
  2. 2.5.2The acceptability of the estimated risks shall be evaluated using risk acceptance criteria either derived from or based on legal requirements stated in Community legislation or in notified national rules. Depending on the risk acceptance criteria, the acceptability of the risk may be evaluated either individually for each associated hazard or globally for the combination of all hazards considered in the explicit risk estimation.
  3. 2.5.3Division 2.5.3
  4. 2.5.4Where hazards arise from failures of technical systems not covered by codes of practice or the use of a reference system, the following risk acceptance criterion shall apply for the design of the technical system:
  5. 2.5.5Division 2.5.5
  6. 2.5.6If a technical system is developed by applying the 10-9 criterion defined in point 2.5.4, the principle of mutual recognition is applicable in accordance with Article 7(4) of this Regulation.
  7. 2.5.7The explicit risk estimation and evaluation shall satisfy at least the following requirements:

Annotations

Textual amendments

F1

Repealed by Commission Implementing Regulation (EU) No 402/2013 of 30 April 2013 on the common safety method for risk evaluation and assessment and repealing Regulation (EC) No 352/2009 Text with EEA relevance.