Division 4.7
United Kingdom
At the time of first contact the centre line of the impactor shall be within a ±10 mm tolerance to the selected impact location.
United Kingdom
At the time of first contact the centre line of the impactor shall be within a ±10 mm tolerance to the selected impact location.