Division 1 F1
United Kingdom
Transmission system operators shall propose and, after approval by the national regulatory authority, implement an incentive-based oversubscription and buy-back scheme in order to offer additional capacity on a firm basis. Before implementation, the national regulatory authority shall consult with the national regulatory authorities of F2connected countries or territories and take account of the F3those authorities’ opinions. Additional capacity is defined as the firm capacity offered in addition to the technical capacity of an interconnection point calculated on the basis of Article 16(1) of this Regulation.
Annotations
Textual amendments
- F1
- F2
Words in Annex 1 point 2.2.2(1) substituted (31.12.2020) by The Electricity and Gas etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/530), reg. 1(1), Sch. 2 para. 19(6)(a)(i); 2020 c. 1, Sch. 5 para. 1(1)
- F3
Word in Annex 1 point 2.2.2(1) substituted (31.12.2020) by The Electricity and Gas etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/530), reg. 1(1), Sch. 2 para. 19(6)(a)(ii); 2020 c. 1, Sch. 5 para. 1(1)