Division 1 The national regulatory authority shall require transmission system operators to apply at least the rules laid down in paragraph 3 per network user at interconnection points with respect to altering the initial nomination if ... at interconnection points demand exceeded offer, at the reserve price when auctions are used, in the course of capacity allocation procedures in the most recent year for which the national regulatory authority has the relevant information for products for use in either that year or in one of the subsequent two years,F1F2F3F4
United Kingdom
- (a)
for at least three firm capacity products with a duration of one month or
- (b)
for at least two firm capacity products with a duration of one quarter or
- (c)
for at least one firm capacity product with a duration of one year or more or
- (d)
where no firm capacity product with a duration of one month or more has been offered.
Annotations
Textual amendments
- F1
- F2
Words in Annex 1 point 2.2.3(1) substituted (31.12.2020) by The Electricity and Gas etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/530), reg. 1(1), Sch. 2 para. 19(7)(a)(i); 2020 c. 1, Sch. 5 para. 1(1)
- F3
Words in Annex 1 point 2.2.3(1) omitted (31.12.2020) by virtue of The Electricity and Gas etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/530), reg. 1(1), Sch. 2 para. 19(7)(a)(ii); 2020 c. 1, Sch. 5 para. 1(1)
- F4
Words in Annex 1 point 2.23(1) substituted (31.12.2020) by The Electricity and Gas etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/530), reg. 1(1), Sch. 2 para. 19(7)(a)(iii); 2020 c. 1, Sch. 5 para. 1(1)