# Regulation (EC) No 715/2009 of the European Parliament and of the Council of 13 July 2009 on conditions for access to the natural gas transmission networks and repealing Regulation (EC) No 1775/2005 (Text with EEA relevance), Division 3

Extent: E+W+S+N.I.

Firm renomination is permitted up to 90 % and down to 10 % of the contracted capacity by the network user at the interconnection point. However, if the nomination exceeds 80 % of the contracted capacity, half of the non-nominated volume may be renominated upwards. If the nomination does not exceed 20 % of the contracted capacity, half of the nominated volume may be renominated downwards. The application of this paragraph is without prejudice to the applicable emergency measures.

---
Source: https://www.legislation.gov.uk/eur/2009/715/annex/I/division/2/division/2.2/division/2.2.3/division/3 (the official version)
Page: https://openlegislation.uk/eu-regulation-2009-715/annex-I/division-2/division-2.2/division-2.2.3/division-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

