Division (1) At all relevant points, transmission system operators shall publish the information as listed in paragraphs (a) to (k), for all services and ancillary services provided (in particular information on blending, ballasting and conversion). This information shall be published on a numerical basis, in hourly or daily periods, equal to the smallest reference period for capacity booking and (re-)nomination and the smallest settlement period for which imbalance charges are calculated. If the smallest reference period is different from a daily period, information as listed in paragraphs (a) to (k) shall be made available also for the daily period. This information and updates shall be published as soon as available to the system operator (‘near real time’).F1F2

United Kingdom

Original text. Later amendments are not shown.

  1. (a)

    the technical capacity for flows in both directions;

  2. (b)

    the total contracted firm and interruptible capacity in both directions;

  3. (c)

    the nominations and re-nominations in both directions;

  4. (d)

    the available firm and interruptible capacity in both directions;

  5. (e)

    actual physical flows;

  6. (f)

    planned and actual interruption of interruptible capacity;

  7. (g)

    planned and unplanned interruptions to firm services as well as the information on restoration of the firm services (in particular, maintenance of the system and the likely duration of any interruption due to maintenance). Planned interruptions shall be published at least 42 days in advanceF3;

  8. (h)

    F4occurrence of unsuccessful, legally valid requests for firm capacity products with a duration of one month or longer including the number and volume of the unsuccessful requests; and

  9. (i)

    in the case of auctions, where and when firm capacity products with a duration of one month or longer have cleared at prices higher than the reserve price;

  10. (j)

    where and when no firm capacity product with a duration of one month or longer has been offered in the regular allocation process;

  11. (k)

    total capacity made available through the application of the congestion-management procedures laid down in points 2.2.2, 2.2.3, 2.2.4 and 2.2.5 per applied congestion-management procedure;

  12. (l)

    F5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Annotations

Textual amendments

F1

Substituted by Commission Decision of 10 November 2010 amending Chapter 3 of Annex I to Regulation (EC) No 715/2009 of the European Parliament and of the Council on conditions for access to the natural gas transmission networks (Text with EEA relevance) (2010/685/EU).

F2

Words in Annex 1 point 3.3(1) substituted (31.12.2020) by The Electricity and Gas etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/530), reg. 1(1), Sch. 2 para. 19(11)(a); 2020 c. 1, Sch. 5 para. 1(1)

F3

Substituted by Commission Decision of 24 August 2012 on amending Annex I to Regulation (EC) No 715/2009 of the European Parliament and of the Council on conditions for access to the natural gas transmission networks (Text with EEA relevance) (2012/490/EU).

F4

Inserted by Commission Decision of 24 August 2012 on amending Annex I to Regulation (EC) No 715/2009 of the European Parliament and of the Council on conditions for access to the natural gas transmission networks (Text with EEA relevance) (2012/490/EU).

F5

Annex 1(l) omitted (31.12.2020) by virtue of The Electricity and Gas etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/530), reg. 1(1), Sch. 2 para. 19(11)(b); 2020 c. 1, Sch. 5 para. 1(1)