Division 1
United Kingdom
Wherever a connection exists in a hydrographic network, all connected link ends and the optional node that take part in this connection have to be positioned at a distance of less than the connectivity tolerance from each other.
Notes on Annex II
Textual amendments
- F1
Words in Annex 2 heading substituted (31.12.2020) by The INSPIRE (Amendment) (EU Exit) Regulations 2018 (S.I. 2018/1338), regs. 1, 13(11)(a); 2020 c. 1, Sch. 5 para. 1(1)