OpenLegislation

Division M PROCEDURES AND METHODS FOR CARRYING OUT RISK EVALUATION AND IMPLEMENTING RISK CONTROL MEASURES WHENEVER A CHANGE OF THE OPERATING CONDITIONS OR NEW MATERIAL IMPOSES NEW RISKS ON THE INFRASTRUCTURE OR ON OPERATION

United Kingdom

Original text. Later amendments are not shown.

  1. M.1Division M.1
  2. M.2Division M.2
  3. M.3Division M.3

Annotations

Footnotes

f1

Annex III to Directive 2004/49/EC, point 2(d).

Notes on Annex II

Textual amendments

F1

Words in Annex 2 heading substituted (E.W.S.) (31.12.2020) by The Rail Safety (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/837), regs. 1, 13(7)(a); 2020 c. 1, Sch. 5 para. 1(1)

F2

Words in Annex 2 heading substituted (N.I.) (31.12.2020) by The Rail Safety (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/837), regs. 1, 18(7)(a); 2020 c. 1, Sch. 5 para. 1(1)