Division W.1
United Kingdom
There are procedures to ensure that the traffic control and signalling system is operated and maintained so as to ensure the safe operation of the railway.
Notes on Annex II
Textual amendments
- F1
Words in Annex 2 heading substituted (E.W.S.) (31.12.2020) by The Rail Safety (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/837), regs. 1, 13(7)(a); 2020 c. 1, Sch. 5 para. 1(1)
- F2
Words in Annex 2 heading substituted (N.I.) (31.12.2020) by The Rail Safety (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/837), regs. 1, 18(7)(a); 2020 c. 1, Sch. 5 para. 1(1)
Notes on Division W
Footnotes
- f1
-
Article 11(1)(b) of Directive 2004/49/EC.