Division W.4
United Kingdom
There are procedures which show that rules covering the safe operation and maintenance of the traffic control and signalling system have been identified and that the applicant can comply with them.
Notes on Annex II
Textual amendments
- F1
Words in Annex 2 heading substituted (E.W.S.) (31.12.2020) by The Rail Safety (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/837), regs. 1, 13(7)(a); 2020 c. 1, Sch. 5 para. 1(1)
- F2
Words in Annex 2 heading substituted (N.I.) (31.12.2020) by The Rail Safety (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/837), regs. 1, 18(7)(a); 2020 c. 1, Sch. 5 para. 1(1)
Notes on Division W
Footnotes
- f1
-
Article 11(1)(b) of Directive 2004/49/EC.