Division 2 F1
United Kingdom
Where vector protection is required, the approval of a structure as vector-protected must be granted only if the criteria in point (c) of Part 3 are met. In order to grant the approval, the competent authority must verify at least three times during the required protection period (at the beginning, during and at the end of the period) the effectiveness of the vector protection measures, by means of a vector trap inside the vector protected structure.