{
  "url": "https://openlegislation.uk/eu-regulation-2010-406/annex-IV/part-2/division-3/division-3.9/division-3.9.1/division-3.9.1.2",
  "json_url": "https://openlegislation.uk/eu-regulation-2010-406/annex-IV/part-2/division-3/division-3.9/division-3.9.1/division-3.9.1.2.json",
  "legislation": "eur/2010/406",
  "legislation_title": "Commission Regulation (EU) No 406/2010 of 26 April 2010 implementing Regulation (EC) No 79/2009 of the European Parliament and of the Council on type-approval of hydrogen-powered motor vehicles (Text with EEA relevance)",
  "legislation_url": "https://openlegislation.uk/eu-regulation-2010-406",
  "path": "annex/IV/part/2/division/3/division/3.9/division/3.9.1/division/3.9.1.2",
  "kind": "division",
  "number": "3.9.1.2",
  "heading": "Frequency of ambient temperature pressure cycling test",
  "text": "Finished containers shall be subjected to the ambient temperature pressure cycling test at a test frequency defined as follows:\n(a)One container from each batch shall be pressure cycled for 3,0 times the number of filling cycles in accordance with section 2.7.6.;\n(b)If on 10 sequential production batches of containers, none of the pressure cycled containers in point a) leaks or ruptures within 4,5 times the number of filling cycles in accordance with section 2.7.6., then the pressure cycle test can be reduced to one container from every 5 batches of production with the container selected from the first of the 5 batches;\n(c)If on 10 sequential production batches of containers, none of the pressure cycled containers in point a) leaks or ruptures within 6,0 times the number of filling cycles in accordance with section 2.7.6., then the pressure cycle test can be reduced to one container from every 10 batches of production with the container selected from the first of the 10 batches;\n(d)Should more than 3 months have expired since the last batch of production, then a container from the next batch of production shall be pressure cycle tested in order to maintain the reduced frequency of batch testing in points (b) or (c);\n(e)Should any reduced frequency pressure cycle test container points (b) or (c) fail to meet 3,0 times the number of filling cycles in accordance with section 2.7.6., then the batch pressure cycle test frequency in point a) shall be reintroduced for at least 10 production batches in order to re-establish the reduced frequency of batch pressure cycle testing in points (b) or (c);\n(f)Should any container referred to in points a), b) or c) fail within 3,0 times the number of filling cycles in accordance with section 2.7.6., then the cause of failure shall be determined and corrected following the procedures in section 3.9.2. The pressure cycle test shall then be repeated on three additional containers from that batch. Should any of the three additional containers fail to meet 3,0 times the number of filling cycles in accordance with section 2.7.6., the batch shall be rejected. The manufacturer shall demonstrate that containers produced since the last successful batch test meet all batch test requirements.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/eur/2010/406/annex/IV/part/2/division/3/division/3.9/division/3.9.1/division/3.9.1.2",
    "retrieved_at": "2026-11-01T14:50:48.674921+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}