Division 1 General Provisions

United Kingdom Repealed

Original text. Later amendments are not shown.

  1. 1.1Division 1.1
  2. 1.2The European Network of Transmission System Operators for Electricity (ENTSO for Electricity) set up in accordance with Article 5 of Regulation (EC) 714/2009 shall establish an ITC fund for the purpose of compensating transmission system operators for the costs of hosting cross-border flows of electricity.
  3. 1.3Contributions to the ITC Fund shall be calculated in accordance with points 6 and 7.
  4. 1.4The Agency shall oversee the implementation of the ITC mechanism and report to the Commission each year on the implementation of the ITC mechanism and the management of the ITC fund.
  5. 1.5Division 1.5
  6. 1.6Transit of electricity shall be calculated, normally on an hourly basis, by taking the lower of the absolute amount of imports of electricity and the absolute amount of exports of electricity on interconnections between national transmission systems.
  7. 1.7For the purposes of this part of the Annex, the net flow of electricity shall mean the absolute value of the difference between total exports of electricity from a given national transmission system to countries where the TSOs participate in the ITC Mechanism and total imports of electricity from countries where the TSOs participate in the ITC Mechanism to the same transmission system.
  8. 1.8Division 1.8

Notes on Part A

Textual amendments

F1

Annex Pt. A omitted (31.12.2020) by virtue of The Electricity Network Codes and Guidelines (Markets and Trading) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/532), reg. 1(1), Sch. 1 para. 4 (as amended by S.I. 2020/1016, regs. 1(2), 5(2)); 2020 c. 1, Sch. 5 para. 1(1)