# Commission Implementing Regulation (EU) No 1207/2011 of 22 November 2011 laying down requirements for the performance and the interoperability of surveillance for the single European sky (Text with EEA relevance), Division 5: The air navigation service provider shall manage the verification activities and shall in particular:

Extent: E+W+S+N.I.

(a)determine the appropriate operational and technical assessment environment reflecting the operational environment;
(b)verify that the test plan describes the integration of systems identified in points (b), (c) and (d) of Article 2(1) in an operational and technical assessment environment;
(c)verify that the test plan provides full coverage of the applicable interoperability, performance and safety requirements of this Regulation;
(d)ensure the consistency and quality of the technical documentation and the test plan;
(e)plan the test organisation, staff, installation and configuration of the test platform;
(f)perform the inspections and tests as specified in the test plan;
(g)write the report presenting the results of inspections and tests.

---
Source: https://www.legislation.gov.uk/eur/2011/1207/annex/IX/part/A/division/5 (the official version)
Page: https://openlegislation.uk/eu-regulation-2011-1207/annex-IX/part-A/division-5
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

