# Commission Implementing Regulation (EU) No 1207/2011 of 22 November 2011 laying down requirements for the performance and the interoperability of surveillance for the single European sky (Text with EEA relevance), Division 2: The manufacturer shall manage the conformity assessment activities and shall in particular:

Extent: E+W+S+N.I.

(a)determine the appropriate test environment;
(b)verify that the test plan describes the constituents in the test environment;
(c)verify that the test plan provides full coverage of applicable requirements;
(d)ensure the consistency and quality of the technical documentation and the test plan;
(e)plan the test organisation, staff, installation and configuration of test platform;
(f)perform the inspections and tests as specified in the test plan;
(g)write the report presenting the results of inspections and tests.

---
Source: https://www.legislation.gov.uk/eur/2011/1207/annex/VII/division/2 (the official version)
Page: https://openlegislation.uk/eu-regulation-2011-1207/annex-VII/division-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

