Division Section 4 Specific requirements for the processing of Category 3 materials
United Kingdom
The following requirements shall apply in addition to the general conditions set out in Section 1:
- 1..
Processing plants processing Category 3 materials shall not be located at the same site as processing plants processing Category 1 or Category 2 materials, unless located in a completely separate building.
- 2..
However, the competent authority may authorise the processing of Category 3 material on a site where handling or processing of Category 1 or Category 2 material takes place, if cross-contamination is prevented due to:
- (a)
the layout of the premises, in particular the arrangements for the reception, and by way of the further handling of raw materials;
- (b)
the layout and the management of the equipment used for processing, including the layout and the management of separate processing lines or of cleaning procedures which are excluding the propagation of any possible risks to public and animal health; and
- (c)
the layout and the management of the areas for the temporary storage of the end products.
- (a)
- 3..
Processing plants processing Category 3 material shall have in place an installation to check the presence of foreign bodies, such as packaging material or metallic pieces, in the animal by-products or derived products, if they are processing materials which are destined for feeding. Such foreign bodies shall be removed before or during processing.